top of page
FORUMLOK™

FORUMLOK™

Fast Cure Forumlok Thread-Locking Compound replaces welding for casing joints on the bottom lengths to prevent unscrewing while drilling out cement. Welding of shoes, couplings, and collars to casing often weakens the casing and should be avoided wherever possible.

Tests under bottom hole temperatures ranging from 50° through 400° F showed Forumlok withstood greater torque than a standard joint welded in three places with 2 inch beads.

Request a product price quote

Stock available.

Thanks for submitting!

Related Products

bottom of page